Consult This Checklist Before You Mix

 1. Are you wearing goggles?  ____
 2. Is everyone nearby wearing goggles?  ____
 3. What is rock / concrete temperature?  ____ (°F)
 4. What is water temperature?  ____ (°F)
 5. What is drill hole diameter?  ____ (in.)
 6. Are numbers 3, 4, and 5 within correct ranges?  ____
 7. Have you measured extra water if rock / concrete is above 73°F?  ____
 8. Is the electric mixer all ready to go and operational?  ____
 9. Has the Betonamit been kept cool?  ____
 10. Are you going to throw a tarp over the filled holes?  ____
 11. Have you read this instruction booklet 100%?  ____

Technical Manual | Mixing Type-R | Mixing Type-S | Notes | Blowout Causes | Checklist | Conversions | Material Safety Data