| 1. Are you wearing goggles? | ____ |
| 2. Is everyone nearby wearing goggles? | ____ |
| 3. What is rock / concrete temperature? | ____ (°F) |
| 4. What is water temperature? | ____ (°F) |
| 5. What is drill hole diameter? | ____ (in.) |
| 6. Are numbers 3, 4, and 5 within correct ranges? | ____ |
| 7. Have you measured extra water if rock / concrete is above 73°F? | ____ |
| 8. Is the electric mixer all ready to go and operational? | ____ |
| 9. Has the Betonamit been kept cool? | ____ |
| 10. Are you going to throw a tarp over the filled holes? | ____ |
| 11. Have you read this instruction booklet 100%? | ____ |